Create your first backup
Create a backup plan, assign the VMs it protects, and then restore one when you need to recover it.
Create your first backup
Before you begin
Check these first — each one is something the backup plan depends on.
- You need permission to create backup plans, assign VMs to them, and run restores. If you are not sure, ask your administrator.
- At least one VM exists to protect — if not, follow Create your first VM (click here) first.
- A storage pool is available to hold the backups — choose one backed by a Proxmox Backup Server.
- If a menu below is missing, your role probably does not include it — see the Permissions reference (click here).
Create the backup plan
The create page defines the plan and, optionally, its VM assignment in one flow.
- Open Data Protection → Backups, then select Create.
- Under Plan Information, enter a Plan Name, an optional Description, and select the Storage Pool that will hold the backups.
- Under Schedule, set the frequency (daily, weekly or monthly), the run time, the days, and the times per day.
- Under Restore Points, set the retention sliders (Days, Weeks, Months and Years are shown according to the chosen frequency); the retention timeline graph previews how long each restore point is kept.
- Optionally assign a resource group and add manual tags under Tags.
- Under VM Assignment, choose the VMs to protect using tag rules (with an AND/OR match mode) and/or by selecting individual VMs; the summary shows the manually selected and tag-matched counts.
- Select Save to create the plan.
- Open the new plan's Jobs tab to review the Backup Job History, or watch runs complete in the Task Manager (top bar).
Expected result: the backup plan is created and its scheduled runs are queued for the assigned VMs.
Choose a restore point
When you need to recover, restore from a completed backup job. A restore always creates a new VM and never overwrites the source.
- Open Compute → Virtual Machines, open a VM, then select its Backup tab (or open Data Protection → Backups, open the plan, and select the Jobs tab).
- Review the Backup Job History timeline, where each point is a backup job coloured by status (success, failed, partial, or running).
- In the Backup Jobs table, identify the completed job you want to recover from.
Expected result: you have identified the restore point (backup job) to recover from.
Run the restore
- From the chosen backup job, select Restore to open the restore page pre-filled with that job's context.
- Enter a Restore VM Name and an optional VM Description.
- Select the Compute Pool and the Storage Pool for the restored VM.
- Set the Initial State to Stopped or Running (leave it Stopped to inspect the VM before powering it on).
- Select Restore to confirm.
- Open the Task Manager (top bar) and track the restore task until it completes.
Expected result: the restored VM appears as a new entry in Virtual Machines, leaving the source VM untouched.
Next steps
- Restore & recovery — the full set of restore options (click here)
- Backups — retention, job history, and assignment options (click here)
Ready to rethink private cloud?
Lower costs. Simplify operations. Deliver more.